Site clearing and leveling:- Site should be leveled against higher than 1\2 feet the nearest higher plot.
Excavated soil should be dumped inside the room.
Foundation p c c 40 mm aggregate to be used.
Provision for bathroom and kitchen – plumping line portion to be provided in the foundation.
When shuttering work is done for slab gap should be properly done without loosing grout.
After concreting confirm that no disturbance has occurred in the concreted portion.
If Concreting is done in hot climatic condition ensure water sprinkling from time to time.
At the time of masonry work all rooms one layer brick layout must be done.
Every day when brick masonry work is done bricks upon mortar must be avoided.
Partially damaged cement can be reused for steps ,car porch ,ramp etc.
All bricks must be soaked into water before use so that water for brick at the time of work can be saved.
Plastering thickness if more than existing requirement when found earlier balance cement mortar can be used.
Piling chips can be used for pcc soling bottom at loose soil portions.
If sump tank or water tank constructed earlier brick, cube, cover blocks etc can be used for curing purpose.
At the time of main slab casting, if provision is made for lintel pcc etc, balance concrete can be used for this purpose.
If painting of inside MS pipe, one side of MS pipe be lifted and other side be kept in a pot so that paints be applied through one side and paints flow evenly and life of MS pipe can be increased.
All nuts and bolts etc if kept in oil, life of the same will increase and will not stain.
For concreting curing in slopped area ,wet gunny bags or hay be kept.
Before flooring works check all room levels and confirm that all the room levels are equal.
Tile cut pieces if any, be used at the bottom of cot’s\wardrobe\sofa etc in the bedroom.
If materials are to be uplifted at the other end of the rope, materials from upper floors to down floors be arranged simultaneously.
When casting of slabs in the reinforcement of all columns if slab thickness is marked in all columns, slab level cast can be done.
The wet sand if spreaded , on the next day the same can be sieved easily.
Corrosion can be minimized if any supporting material is kept on the ground.